Province | Subbasin | % |
---|---|---|
Mountain Snake | Salmon | 100.00% |
Previous: | Next: |
---|---|
76913 REL 38: 2007-394-00 EXP ID WATERSHED HAB RESTOR LEMHI |
|
* Expenditures data includes accruals and are based on data through 31-Dec-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Effective implementation management and timely contract administration | A: 119. Routine administration of contract | 08/31/2024 | 08/31/2024 | |
Complete all necessary permitting | C: 165. Section 7 ESA consultation, permitting, Section 106 cultural consultation, NEPA | 08/31/2024 | 08/31/2024 | |
Completed Annual Report | D: 132. Submit Progress Report for the period (Sept 2022) to (Aug 2023) | 06/30/2024 | 01/05/2024 | |
Coordination of the Upper Salmon Basin Watershed | E: 191. Watershed Coordination of the Upper Salmon Basin | 08/31/2024 | 08/31/2024 | |
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish | F: 114. Identify and Select Projects in the Upper Salmon Basin | 08/31/2024 | 08/31/2024 | |
Provide technical review of designs and draft documents | G: 122. Provide design technical review | 08/31/2024 | 08/31/2024 | |
Produce engineering designs for Lemhi conservation projects | H: 175. Produce engineering designs for Lemhi conservation actions | 08/31/2024 | 08/31/2024 | |
Conduct outreach and education on USBWP mission, projects, and fish habitat | I: 99. Outreach and education | 08/31/2024 | 08/31/2024 | |
Unscheduled maintenance/repairs completed as needed | J: 186. Perform Unscheduled Maintenance of Habitat Project Sites | 08/31/2024 | 08/31/2024 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 119 | Routine administration of contract | |||||||
B | 185 | Periodic Status Reports for BPA | |||||||
C | 165 | Section 7 ESA consultation, permitting, Section 106 cultural consultation, NEPA | |||||||
D | 132 | Submit Progress Report for the period (Sept 2022) to (Aug 2023) | |||||||
E | 191 | Watershed Coordination of the Upper Salmon Basin | |||||||
F | 114 | Identify and Select Projects in the Upper Salmon Basin | |||||||
G | 122 | Provide design technical review | |||||||
H | 175 | Produce engineering designs for Lemhi conservation actions | 07/20/2023 | ||||||
I | 99 | Outreach and education | |||||||
J | 186 | Perform Unscheduled Maintenance of Habitat Project Sites | 07/20/2023 |